This CIGRE Green book on accessories for HV and EHV extruded cables covers relevant issues in cable system design, cable design, and submarine cables, including offshore generation connection. It provides comprehensive and unbiased information, essential recommendations and guidelines for design, installation, testing and maintenance of accessories to professionals through the exceptional expertise of the authors. The publication is divided in two volumes covering land and submarine applications, HVAC and HVDC systems, andtransitions from lapped cable systems to extruded cable systems, from OHL to UG cables and from cables to substations. It equips the reader with recommendations for testing, installation, maintenance, and remaining life management. This volume is dedicated to Land and Submarine AC/DC Applications while Volume 1 deals with Components. The book compiles the results of the work achieved by several Working Groups and Task Forces of CIGRE Study Committee 21/B1, and Joint Working Groups and Joint Task Forces with other Study Committees. Many experts from Study Committees 21/B1 (Insulated Cables), 15/D1 (Materials and Emerging Test Techniques), 33/B3 (Substations), C3 (System Environmental Performance), and C4 (System Technical Performance) have participated in this work in the last 30 years in order to offer comprehensive, continuous, and consistent outputs.
Title is also available as part of a set: Accessories for HV and EHV Extruded Cables (978-3-030-80407-7)
Auteur
The Study Committee B1 of CIGRE (Insulated Cables) covers underground and submarine, AC and DC, Insulated Cable Systems. SC B1 (formerly SC 21) was established in 1927 and celebrated its 80th anniversary during the 2007 Study Committee meeting in Osaka (Japan).
Pierre Argaut graduated as an Electrical Engineer from the "Institut d'Electrotechnique de Grenoble" in 1971. He joined Delle-Alsthom (Now part of Alstom Grid) in Nov 1971 and took several positions before heading the R&D Department on GIS. After being Operation Manager of South European Pipeline, he joined SILEC in 1988 and retired at the end of 2010. His last position with SILEC was Senior Vice President. In Study Committee B1 (Insulated Cables) Pierre has held position of Working Group Member (21.09;21.06;21.07;21.17), French SC Member, Working Group Convener (B1.19), Special Reporter (2010), Advisory Group Convener (Tutorial Advisory Group till 2010) and is currently Chairman of SC B1 since 2010. He received the Technical Committee Award in 2000 and Distinguished Member Award in 2002.
Contenu
12 Guidelines for safe work on AC cable systems under induced voltages or current
12.1 Introduction
12.2 Definition of induced voltages
12.3 Principles of safe work
12.4 Work procedures
12.5 Working conditiond
12.6 Methods of Calculation
12.7 Conclusion
12.8 Bibliography/References
13 Recommendations for testing of long AC Submarine Cables with Extruded Insulation for System Voltage above 30(36) to 500 (550) kV
13.1 Introduction
13.2 Definitions
13.3 Current technologies for submarine cable designs
13.4 Current technologies for submarine joint designs
13.5 General aspects on submarine cable testing
13.6 Routine Test
13.7 Sample Test
13.8 Type Test on Cable System
13.9 Prequalification Test 13.10 Extension of Qualification Test 13.11 Electrical tests after installation
13.12 References
13.13 Appendices
14 Accessories in Transitions from Overhead to Underground
14.1 Transition in Compounds/Substations
14.2 Transition on Towers/poles
15 Accessories in Large Cross-Section Cable Systems
15.1 Scope and definitions
15.2 Introduction
15.3 Rigid Installations
15.4 Flexible installations
15.5 transition between rigid and flexible Systems
15.6 Duct installations
15.7 Short-circuit forces
15.8 Cleat applications
15.9 Mechanical cable parameters
15.10 Conclusions
15.11 Bibliography/References
15.12 Annexes 16 Recommendations for mechanical testing of submarine cables and their accessories 16.1 Introduction
16.2 Definitions
16.3 Mechanical handling of submarine cables
16.4 General aspect of mechanical testing
16.5 type tests
16.6 Project specific tests and special tests
16.7 Bibliography/references
16.8 Annexes
17 Recommendations for testing DC extruded cable systems for power transmission at a rated voltage up to 500 kV.
17.1 Introduction
17.2 Development tests
17.3 Prequalification tests
17.4 Type Tests
17.5 Routine tests
17.6 Sample tests
17.7 After installation tests
17.8 References 17.9 Appendices 18 Recommendations for Testing DC Transition Joints for Power Transmission at a Rated Voltage up to 500kV.
18.1 Introduction
18.2 Definitions
18.3 Development Tests
18.4 Routine Test
18.5 Sample Test
18.6 Type Test 18.7 Prequalification Test 18.8 Electrical Test after Installation
18.9 References
18.10 Appendix
19 Surge Voltage Limiters and Link Boxes
20 Maintenance and remaining life management of accessories
20.1 Maintenance
20.2 Remaining life management 21 New Work Items 21.1 HVAC
21.2 HVDC